Challenge
Projects come in all shapes and sizes. But success is always a matter of the same key factors. Most notably, delivering on budget and schedule—the ultimate domain of project controls.
Brownfield or greenfield. During shutdown or on regular time. Traditional or fast-tracked. Each project is different, varying as to location, execution strategies, contractual arrangements, labor availability, and logistical challenges. Regardless of the particulars, costs need to be estimated and schedules developed to establish realistic baselines for projects to be appraised and approved.Estimators and planners must take all these factors into account. They bring their skills and knowledge, along with the project team, to develop realistic cost estimates and schedules during the project planning phase. Project risk analysis also needs to be performed, considering all the elements and possibilities, and how any or all of them could affect the ultimate result.
A project controls team needs to interface with all disciplines. It's the hub of the information wheel, receiving data from all levels, assessing, massaging, and transforming it into concise information and analysis for decision-making by managers. It's all about getting the right information to the right people at the right time. Because better information means better decision-making. And better decisions unlock value.
Capabilities
Project controls management and systems
Because no two projects are ever exactly alike, controls must reflect the size and parameters of the task. Our skilled teams are led by experienced project controls managers who see the bigger picture. The starting point is the project controls plan, a component of the larger project execution plan.Our project-management system integrates all project aspects to ensure correct, real-time information and a streamlined effort. Control charts and key metrics pinpoint potential variations from plan. We take remedial action to deliver your project and not only meet, but exceed, your expectations for cost and schedule.